Attendees of Platform Event Construction & Design and Facilities & Estates Management Platform, Off Grid Energy Ltd, have been making significant waves in terms of savings in the UK Construction sector with their Grid-to-Go product – see below some of the recorded savings due to the application on just 1 construction site.

Attendees of Platform Event Construction & Design and Facilities & Estates Management Platform, Off Grid Energy Ltd, have been making significant waves in terms of savings in the UK Construction sector with their Grid-to-Go product – see below some of the recorded savings due to the application on just 1 construction site.

GRID-to-GO by OFF GRID ENERGY LTD – www.offgrid-energy.co.uk

How much can Grid to Go save?

The table below summarises performance of a live UK construction project where one 16kVA Grid-to-Go was installed together with a 40kVA generator for a rental period of 81 days. The data shows the savings that were made in fuel consumption, CO2 emissions and costs.

Performance Summary Total hours in
period
Recorded generator
run hours in period
Fuel saving in
litres*
Saving £
@90p/litre
CO2
Saving
Other
savings**
Actual period: 81 days (19/07/13 to 8/10/13) 1944 hours 774 hours 7,078 litres £6,370 18,757 Kg £800
Equivalent 30 day period 2,621 litres £2,359 6,945Kg £296
Equivalent 12 month period 31,458 litres £28,308 83,340Kg £3,552

* Based on 40kVA generator consuming 6.05l/hr at 25% load.

** Reflects reduced maintenance costs for fewer running hours.

Stay Connected on LinkedIn

Want exclusive event updates and industry insights? Follow us on LinkedIn and join the conversation!

Register Your Interest

Let us know which of our platforms you’re interested in, and we’ll be in touch to help you explore the opportunities. Fields marked (*) are mandatory in order to submit this form.

Please select which platforms you're interested in: